Simple & Preliminary Investigation ProceduresĮach of these subjects will take the reader through the step by step process of performing that phase of the pre-design site analysis and will discuss the suitability of each for the respective level of service of the respective docking facilities.Determination of Site Water Level Ranges. ![]() ![]() These basics are: Fetch & Wave Climate Forecasting These range from simple recreational piers to light commercial facilities. This continuing education program is intended to provide the design engineer with the basic essentials for performing several levels of site assessment as appropriate for the structures discussed within this text. A very important component of the maritime design process becomes one of properly assessing a perspective site, and advising your client as to the pros and cons associated with site suitability and in fact must be the first step in planning any maritime facility.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |